FY08 MCON P-431 Alpha and Bravo Wharf Improvements at the Commander Naval Region Marianas, Polaris Point – Guam
The design-build Alpha and Bravo Wharf Improvements project upgraded the existing wharves, constructed new utilities and support...
Read MoreKilo Wharf Improvements – Guam
The KILO Wharf Improvement Project provided improvements for the COMNAVMARIANAS Ordnance Department at Kilo Wharf and Orote Point,...
Read MorePAG Earthquake Damage Repair and Modification at Wharf Berth F3 – F6
Guam suffered severe damages to its infrastructure buildings including the only commercial port on the island during the 1993...
Read MoreRepair Island Access Facilities, Phase I, Wake Island
This project involved the construction of a new wharf (dock facility) for the Navy (ROICC) located in Wake Island. The work included the...
Read MoreAMEC North Runway – Aircraft Arresting System (BAK-12), AAFB – Guam
The project “AMEC North Runway – Aircraft Arresting System (BAK-12)” located at Andersen Air Force Base, Guam was a complete replacement...
Read MoreAMEC Repair Replacement of South Ramp 6 Hardstand and Runway 24L Overrun – AAFB, Guam
Black Construction Corporation (BCC) was contracted by AMEC to remove approximately 1000 lf of existing asphalt pavement at the South...
Read More